Stennis ADR & PDR Facilities

Stennis ADR/PDR Facilities

Stennis ADR & PDR Facilities

Hancock County, MS

The ADR / PDR Training sites will be utilized by the U.S. Navy to conduct Airfield and Port Damage Repair training. The training facilities include a mock runway and taxiway, storage and lay down areas, a boat ramp and finger pier, bent pile and fleet mooring modules.

SE was retained to provide Geotechnical Engineering services with borings drilled on land and in water through a floating barge.

Year Completed

2021

Construction Cost

$15 Million

Market

Scroll to Top